CN5010 Resource Management And Control In Construction
Lecture Notes Syllabus Book Previous 2 13
15 Marks Anna University Important
Question Bank With Answers Regulation 2017 Study Materials Pdf Ppt
CN5010 RESOURCE MANAGEMENT AND
CONTROL IN CONSTRUCTION
UNIT I RESOURCE PLANNING
Resource Planning, Procurement,
Identification, Personnel, Planning for material, Labour, time schedule and cost control, Types of
resources, manpower, Equipment, Material, Money, Time.
UNIT II LABOUR MANAGEMENT
Systems approach, Characteristics
of resources, Utilization, measurement of actual resources required, Tools for measurement of resources,
Labour, Classes of Labour, Cost of Labour, Labour schedule, optimum use Labour.
UNIT III MATERIALS AND EQUIPMENT
Material: Time of purchase,
quantity of material, sources, Transportation, Delivery and
Distribution.Equipment: Planning and selecting by optimistic choice with
respect to cost, Time, Source and handling.
UNIT IV TIME MANAGEMENT
Personnel time, Management and
planning, managing time on the project, forecasting the future, Critical path
measuring the changes and their effects – Cash flow and cost control.
UNIT V RESOURCE ALLOCATION AND
LEVELLING
Time-cost trade off, Computer
application – Resource levelling, resource list, resource allocation, Resource
loading, Cumulative cost – Value Management.
REFERENCES:
1. Andrew,D., Szilagg, Hand Book
of Engineering Management, 1982.
2. Harvey, A., Levine, Project
Management using Micro Computers, Obsorne -McGraw Hill C.A.Publishing Co.,
Inc. 1988.
3. James.A., Adrain, Quantitative
Methods in Construction Management, American ElsevierPublishing Co., Inc.,
1973.
4. Oxley Rand Poslcit, Management
Techniques applied to the Construction Industry,Granda Publishing Ltd., 1980.